Strip Out – Toymate

Project

Strip Out – Toymate – Macarthur Square (Lendlease)

Type

Commercial End of Lease Retail Make Good

Value

$75,000 + GST

Size

500sqm

Description

The client was required to vacate and make good the current store before relocating. JNC Projects was contracted to strip out and make good the store according to the landlord’s scope of works. Main elements of the works associated with this contract include the following proposed works: Remove and dispose of all fixtures/gondolas/shelving and fixtures. Make good inter-tenancy walls including sanding to a smooth surface. Floor was grinded to remove the epoxy flooring (500sqm). Concrete ramp leading to front of store was removed and the whole floor was returned back to base slab with a smooth finish. Cut front of store back to lease line. Demolish bulk head, ceiling & remove associated hangers. Remove entire shop front including signage, glass and door. Remove and terminate all electrical circuits back to the distribution board. Remove HVAC and lighting fixtures. Demolish partitioning walls. All plumbing fixtures removed, and drains capped. Remove all rubbish. Environmental management was conducted by recycling as much material as possible. All work was completed after centre hours with no disruptions to the shopping centre customers or tenants. The project was completed on time and within budget. The client and centre management were very pleased with our work.

Gallery

Testimonial

“Thank you for an excellent job – quick and efficient throughout the whole process”

~ Danny

JNC Projects

JNC Projects is an innovative deconstruction company that has gained its reputation for superior workmanship and it's customer focused approach.

Support

  

© JNC Projects. Developed with by JNC Projects.